Laserfiche WebLink
. ., <br /> . - <br /> QLOBED CYa 1�OR1C ORDERS REPORT <br /> Total Utility Mai.ntenance Management System page 1 <br /> 09/25/1995 <br /> ----- <br /> ------____:�_______�______________________________________ <br /> ===s�====____�__------ <br /> Date Ranqe :O1/09/1989 - 09j21/1995 <br /> CM Work Order Range :1001091070001 - UT2608- - Pattern :*101196730120 <br /> Item Ranqe :<Blank> - y7W22020001 <br /> Program ALL Function ALL Activity ALL <br /> ________________________ _____________________________________---------- <br /> <MDUPLICATEEPRINTING�OF9THZS1WORK ORDER»REPAIR 804 WAVERLY /t���G <br /> item ID: -- <br /> Location ID: '- Activity 673 <br /> Proqram 710 Fun.-tion 119 <br /> Date Completed: 09/21/1995 <br /> Overall Crai`t: Issued by: JSM Assigned to: <br /> Issued: 09/19/1995 Travel Time: 0.00 Hr. <br /> Out of Service? NO Priority: <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Laboi: planned Hrs Actual Ars Cost <br /> Craft ID Name --------" <br /> --------- ----------- <br /> ---------- <br /> ----------------- 0.00 13.50 108.00 <br /> DL IRW IRVIN, RYAN WILLIAM p,00 6.00 123 .06 <br /> WST JSM JEX, STERLING M. JR. 0.00 9.50 197.60 <br /> WST LDS LOFLING, DEI,MAR S. p,00 18.50 278.06 <br /> UL SSJ SMITH, STEVE J. 0.00 18.50 278.06 <br /> UL WMJ WRIGHT, MICHAEL J. _--------- <br /> Total Labor Cost: 984.77 <br /> Mat�rials: Date # Used Cost <br /> ID Description _____--i ---------' <br /> ----- -------- 13.80 <br /> BOX000043747 BOX VALVE CI RISER Z"-12'�ADJ 09/20/1995 1 36.27 <br /> BOX000044647 BOX VALVE 5' PLASTIC 2 205.16 <br /> COUP50029047 COUPLING 12"DI&CI X 12"DI&CI 09/20/1995 3 48.93 <br /> PiPE50054647 PIPE 12" TYTON JOINT DI ______---- <br /> Total Material Cost: 304 . 16 <br /> V�hicl�e: Hours Cost <br /> Ip Description __ ______---- <br /> ---------------- <br /> -----------"' 103.60 <br /> ------------ 18. 50 <br /> V211? 91 CFiEV 1-TON HYD UNIT 10.50 53.55 <br /> V2146 87 CAEV 1 TON W/HYD. UNIT 6.�� 25,20 <br /> V2328 86 DODGE VAN 4 ,00 110.40 <br /> VH0003 94 CAT BACKHOE ________-- <br /> Total Vehicle Cost: 292•�5 <br /> 1581 68 <br /> Total cost for work order 7101196730120: <br />