Laserfiche WebLink
everett INSPECTION REPORT <br /> eAddress �>> l�iul.!/lO �✓ <br /> Contractor �P� L���7�' <br /> Owner �� �C <br /> Date �� -�-_g9 <br /> TYPE O� INSPECTION REQUESTED <br /> ��LDG: Pmt. No. a/97/ ❑ MECH: Pmt. No. <br /> ❑ ELEC: Pmt. No. ❑ PLBG: Pmt. No. <br /> ❑ Temp. Elect. O Framing ❑ Gas Piping <br /> ❑ Footi�g ❑ Drywall, Naiiing ❑Consultation <br /> O Foundetion ❑Shear Nailing ❑Groundwork <br /> ❑ Ductwork ❑Grid �Struct.Slab <br /> ❑Wood Stove ❑ Rough-In p Fi I <br /> ❑ Masonry ❑Service ❑ ��Q� ��„� <br /> �[APPROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> O Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact inspector and arrange for appoiniment. <br /> i ❑Was not able to peAorm inapection. <br /> ❑CALL 259•8810 FOR REINSPECTION—24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON ,' <br /> THE PREMISES PRIOR TO OCCUPANCY. � <br /> si�L,��� - <br /> ' �Y�SV�JC0. �o ° aCP <br /> lhSC0.�P ��S � m-.+ C�JC <br /> Inspedor � Date ��� `B <br /> / <br />