Laserfiche WebLink
� . � � C <br /> ROU^qS l•'nntuo PirSiAeni „ <br /> GlenlA;,.-��� VicrP�rstic:�1 <br /> na�un�saa;t C�nel Enp�nrci ��� � �:e�1��1 �:n1lSUlte"11`liS Ill('. <br /> � Dou SP��" ln:��ar.mc^i��n���.!v � <br /> � BdlRotlqec tnvnonmentalAlanage' :� �••�",�"�^.�u���^••,•.�•.*+��•�•����,�"•���•����a�.,���.�. <br /> Chailes Vae Cnqmeeimg Managei � + � � <br /> � WJham Chang EngineeunQ Managei � <br /> IDecembet 30, 1988 E-4212 � <br /> I � <br /> Ts.ang Partnership <br /> 784 Market Street, Suite 300 <br /> Tacoma, Washington 98402 <br /> Attention: Mr. Paul Al:iyama <br /> Gentlemen: <br /> We are pleased to submit herewith our repon titled "Geotechnical Engineering Study, for the <br /> Everett Community College Day-Care Center, Everett, Washington." This report presenu <br /> the resulu of our �eld exploration, selective laboratory tests, and engineering analyses. The <br /> purpose and scope of our study was outlined in our November 22, 1988 proposal. <br /> I Our site study indicates that below a two-inch asphalt concrete, the site is underlain by a � <br /> competent overconsolidated silry clay which was encountered in all exploration pits. <br /> I The proposed day care center building facility may be adequately supported by continuous <br /> perimeter wall footing and conventional spread footings for the interior columns. Footings <br /> bearing on competent soil can be slesigned using a maximum allowable soil bearing pressure <br /> � �f two thousand (2000) pounds per square foot (psfj. <br /> These recommendations, along with other geotechnically-related aspects of the project are <br /> discussed in more detail in the text of the attached report. <br /> We appreciate this opportuniry to be of service to you on this project. We look forward to <br /> working with you in the future phases as the project comes to fruition. In the meantime, <br /> should you have any questions about the content of this repon, or if we can be of further <br /> assistance, please call. <br /> Very truly yours, <br /> EARTH CONSULTANTS, INC. <br /> � � <br /> Glen iv1ann, P. E. <br /> Vice-President <br /> GM/kml <br /> �P�5 �36�'�Piace N E .Swle 101.BeUevue_Washinplon 9Ba15 <br /> ??:C 26'h SlieeL Sude 707.Tacoma Wash�ngtnn 984119998 <br /> p,� �;,„5� � : '. Sez!tie(206)46a 7584 fAX�^06V460B60 Tacoma(2061272 66DB � <br />