My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
902 WESTMINSTER CIR 2016-01-01 MF Import
>
Address Records
>
WESTMINSTER CIR
>
902
>
902 WESTMINSTER CIR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 8:59:22 AM
Creation date
3/9/2017 8:59:08 AM
Metadata
Fields
Template:
Address Document
Street Name
WESTMINSTER CIR
Street Number
902
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> � �ASCqpE GEOTECHNICAL INC• <br /> August 6, 1992 Job No. 9207-0SG <br /> barrier between the bottom of the siabs and the capillary break material. If desired, one (1) W <br /> _ two (2) inches of clean sand may be placed over the vapor barrier to aid concrete curing. <br /> _ Pnrmanent Draina¢e <br /> — In addition W the foum;ation drains for the retaining walls discussed in the "Bac�lled Walls" <br /> section, we recommend placing a continuous drain along the outside, lower edge of the <br /> — perimeter footings and tightlining it to a suitable drainage outlet. The drain should consist of <br /> a four (4) inch diameter, perforated, rigid pipe that is be�ded and backfilled with at least twelve <br /> (l2)inches of pea gravel. The roof downspouts shonld be tightlined to a suitable drainage outlet <br /> ' separately fmm the footing drains. No drains should oudet onto the slope. <br /> — GENERAL <br /> The preliminary recommendations provided here are based on our understanding of the project <br /> at this time. We recommend our engagement in the development of the plans to provide <br /> additional, augmented, and/or more detailed recommendadons as required. <br /> Adverse soil and/or groundwater conditions may be encountered during grading; therefore, we <br /> � also recommend our engagement during these operations so that immediate, on-site <br /> recommendations can be made. Site preparation, subgrade verification, and other types of <br /> earthwork should also be observed/monitored by onr personnel. T'hese recommendations arc for <br /> engineering review, and go beyond any testing agency involvement which may be required• <br /> We expect the on-site soil conditions to reflect our findings; however, some variations may <br /> occur. Should soil conditions be encountered that cause concern and/or are not discussed hercin, <br /> Cascade Geotechnical Incorporated, should be contacted immediately to determine if additional <br /> _ or altemate recommendations are required. <br /> , 9 <br /> -- � <br /> � r� <br />
The URL can be used to link to this page
Your browser does not support the video tag.