Laserfiche WebLink
�MF"�`� `��� NWEC LC�RISE RESIDENTIAL CO: ?LIANCE CHECKUST ;;, <br /> CdMPII�'E- x� <br />� Aeouiaeo� ""� Ef3ctrlcelly heated dwellings s 3 stories, Zone 1, Western Washington ' ��� <br /> `� ..�r�. ,.�_�... , x <br /> , e.. .� <br /> o��_ ��.- : <br /> � �r�o ir+saecrioN �MpORTAN7: Please supply Inlormatlon requested In the shaded box below. <br /> A �� APPqOVED Dlsregard loplcs that don't describe your bullding or equlpment. QQ.A14.I <br /> a y y piace checks In the two lelt co�umns. <br /> � <br /> ,.a o FOUNDATION PHASE: side off the <br /> o�H� � p S018� 0�I0�tati0ll (Chapter 6, Option III,or Chap 4 only):Glazing on the <br />� y y i..� home musl face within 45 degrees ol due soulh. No more than 60%of the glazing may IiE bclween 31 to <br /> x 45'ot due South. <br /> p �d "��Choose an A or B opt/on and below grode wall Insulatlon optlon: <br /> H�g ❑ ❑ > Radon MlHpatlon slab requiremenls will be addressed by: <br /> n� c� ❑ A.4"course grade grave base �nder slab(jurisdiction will ofter Iree Radon monitoring option) <br /> �r-i � O R <br /> �y ❑ B.Slab won't be poured over gravel base, Dweilin9 will be monilored for Radon when <br /> y completed. (Department staff wiil provide detailed requirements of Ihis option) <br /> g d y � � ' Slab Insulatlon will be ❑ R10 (Ch#6, all options) or ❑ R_(Ch#4 or5): <br /> ❑ A. Exterior slab insulation will eztend downward lo frostiine or Ihe slab bottom, <br /> ��� OR <br /> y � y ❑ B. Interior slab insulation will extend downward lrom Ihe top elab surface to Ils undersurtace <br /> a�d horizontally under lhe slab lor a total distance of 24",or vertically 24". <br /> � ❑ ❑ Belaw grede masonry wall Insulatlon will be: <br /> ❑R10(Ch H6, All options) on lhe exterior wall instead o� F'INALePHASE RE�UIREMENTS) <br /> � OR <br /> � ❑ R_(Chapler 4 or 5) <br /> �� p ❑ r; Thermal break(s) wlll be placed in the slab between the conditioned and unconditione� spaces <br /> '� checked below, and extend trom the top of the slab to the bollom,then underneath toward the <br /> `' conditioned space for a 24"total developed dimension. <br /> ❑dwellinglgarage ❑ dweltinglconnected space ❑ slab edge and foundalion wall. <br /> I L ' p ❑ Exposed above-grade Insulatlon protected wilh stucco coating, or metal or plastic Ilashing. <br /> p p Vepor retarder(<t pErm) required under the slab because course grade gravel either is not installed or <br /> less than 2"ihick. <br /> �� � p Insulatlon fs approved for sub-grade, exterior uso and properly installed. <br /> ��� <br /> � � <br /> NWEC Foundation phase requlrements: <br /> Approved by: <br /> Date <br /> $ rtIb01S USBd' e uals rearer than � leaa than � a reater Ihen ar e ual lese Ihan ar e uel <br /> WEE4 APPiL 00 <br /> Page 3 ot 7 <br />