My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4777
>
Resolutions
>
Resolution 4777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 9:50:50 AM
Creation date
3/9/2017 9:50:31 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4777
Date
6/30/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Department of Transportation Page 9 Six Year Transportation Improvement Program <br /> -en <br /> Agency Everett From 2000 to 2005 <br /> County No. 31 Hearing Date 6/23/99 <br /> City No. 0420 Adoption Date 6/23/99 <br /> MPO PSRC Resolution No. <br /> Project Identification Project Costs in Thousands of Dollars Federally Funded <br /> A. Federal Aid No. t a Fund Source Information - Expenditure Schedule Projects Only <br /> Ts B. Bridge No. E— ar a (Local Agency) <br /> E y Z C. Project Title >a 3 3 D Federal Funding R/W <br /> y. <br /> is .g E D. Street/County Road Name or Number n� m 7.2 3 Phase Federal Federal State _ - 4th Required <br /> v > o a Project State Local Total Envir. Date <br /> ti a z E. Beginning MP or road- Ending MP or road € r m phase Start Fund Cost by • Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM <br /> F. Describe Work to be Done onmidcy ) Code Phase Code 6th <br /> 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 20 2 Phases in Project 05 P 0.4 C PE 1/12001CN 4/1/2002 500 100 600 100 500 No <br /> P • <br /> 3rd Avenue SE Street Improvements • T <br /> • <br /> • 3rd Avenue SE • <br /> • <br /> O <br /> .• <br /> 92nd Street SE to 95th Street SE <br /> Design and Construct Street Improvements Totals -- -- 500 100 600 100 500 <br /> 19 21 2 Phases in Project 05 P 0.2 C PE 1/12001CN 7/1/2001 85 25 110 110 -- — No <br /> P <br /> 10th Street Improvements T <br /> 10th Street • O <br /> Pine Street to East Marine View Drive <br /> Design and Construct Road Widening,Intersection Improv., Totals 85 25 110 110 -- <br /> 19 22 -- --- 3 Phases in Project 01 P 0.1 C PE 1/1/2000 1 j 'L 1 ,,, <br /> 17/ i Yes <br /> • 106th PL SE Improvements G CNRW 4111200199 1 300 300 150 150 <br /> • <br /> 106th PL SE p <br /> • 16th Ave.SE to 19th Ave.SE(SR 527) _ • <br /> • <br /> Design and Construct Street Improvements W Totals 300 300 150 150 <br /> Grand Totals for Everett 880 880 670 150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.