My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4777
>
Resolutions
>
Resolution 4777
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 9:50:50 AM
Creation date
3/9/2017 9:50:31 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4777
Date
6/30/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> 2000 TO 2005 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Interstate Local Access <br /> 1. I-5 Corridor Improvement Study 1. Annual Street Overlays(citywide) <br /> 2. I-5 Median HOV Lanes(SR 526 to US 2) 2. Neighborhood Traffic Mitigation Projects <br /> and Auxiliary Lanes 3. Pedestrian Improvements(citywide) <br /> 3. I-5/41st Street Interchange 4. Neighborhood Block Grants <br /> 4. I-5/112th Street SE Interchange 5. Traffic Signal Interconnect <br /> 5. I-5/112"Street SE HOV Ramps 6. Pavement Marking Projects(citywide) <br /> 6. I-5/112`Street SE Park and Ride/Flyer Stop 7. Traffic Signal Improvements(citywide) <br /> 7. I-5/US 2 Interchange 8. Developer Traffic Signals(citywide) <br /> 8. I-5/SR 96 Interchange 9. Hazard Elimination and Safety(HES)Projects <br /> 10. Roadway Hazard Elimination Projects(citywide) <br /> Freeways and Expressways 11. Neighborhood Traffic Studies <br /> 1. US 2 Snohomish River Bridge Widening(3rd lane) 12. Northern Extension of Interurban Trail, Stage II <br /> 2. SR 526 HOV Lane(I-5 to 34th Ave.W) 13. Riverfront Walkway,Phase I <br /> 3. SR 526/Hardeson Road Interchange Study 14. Riverfront Walkway Overcrossing <br /> 15. Riverfront Walkway,Phase II <br /> Principal Arterials 16. Everett Nonmotorized Transportation Projects <br /> 1. 19th Avenue SE(SR 527; 112th St. SE to 132nd St. SE) 17. City Entryway Landscaping and Signs <br /> 2. East Marine View Drive(North Broadway to 1-5) 18. Riverside Area Street Improvements <br /> 3. Pacific Avenue Overcrossing(McDougall Ave.to 19. Neighborhood Street Improvements <br /> Fulton Ave.) 20. 3rd Avenue SE(92nd St. SE to 95th St. SE) <br /> 4. Evergreen Way(112th St. SW to 11500 Block) 21. 10th Street(Pine St.to E.Marine View Dr.) <br /> 5. Evergreen Way(11500 Block to Airport Road) 22. 106th PL SE(16th Ave.SE to SR 527) <br /> 6. Evergreen Way(47th St.to 41st St.) <br /> 7. 41st Street (Friday Ave to Rucker Ave.) Transit <br /> 8. Broadway Corridor Study 1. Bus Replacements(2000-2003) <br /> 9. Arterial Needs Studies(Principal,Minor,and Collector) 2. Bus Expansion(2001,2002) <br /> 10. Airport Road HOV Lanes 3. Vehicle Maintenance Capitalization <br /> 11. SR 525 Corridor Improvements 4. Regional Fare Coordination Project <br /> 12. Paine Field Blvd.Extension Studies 5. Operations Support Vehicle Replacement <br /> 13. Evergreen Way/SR 99 HOV Treatments 6. Transit Op.&Maint.Facility Siting Study <br /> 14. 19th Avenue SE(SR 527)HOV Treatments 7. Boeing Mitigation Park and Ride Lots <br /> Minor Arterials HOV Projects <br /> 1. 41'Street Overcrossing and Riverfront Parkway 1. Everett Station(Multi-modal Center)Phase III-Constr. <br /> 2. 112th Street SE(SR 525 to SR 527) 2. Everett Station(Multi-modal Center)Commuter Rail <br /> 3. 4th Avenue West(Holly Dr.to 88th St SW) 3. South Everett Transit Center Design-Sec.9 <br /> 4. 100th Street SW(Evergreen Way to Airport Road) 4. South Everett Transit Center Design(Sound Transit) <br /> 5. South Everett Transit Center Right-of-Way-(Sound Transit) <br /> Collector Arterials 6. South Everett Transit Center Construction-CMAQ <br /> 1. Cedar Street(Everett Ave.to Pacific Ave.) 7. South Everett Transit Center Construction-Sec.9 <br /> 2. 36th Street Park&Ride Lot and Access Improvements 8. South Everett Transit Center Construction-(Sound Transit) <br /> 3. 37th Street(Rucker Ave.to Broadway) 9. North Everett Transit Center-PS&E Design-(Sound Transit) <br /> 4. California Street Overcrossing(Everett Ave.Extension) 10. North Everett Transit Center Design-Sec. 9 <br /> 5. Holly Drive(92nd St. SW to Southern City Limits) 11. North Everett Transit Center Construction-Sec.9 <br /> 6. Everett Avenue BNSF Overcrossing to Railway Ave. <br /> 7. 52nd Street SE(Colby Avenue to Evergreen Way) <br /> 8. 16th Street(Maple St.to Walnut St.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.