Laserfiche WebLink
CI.OSED QI IiORR ORDffiLS RSPORT <br /> Total Utility Maintenance Management System paye 1 <br /> 10/25/1996 <br /> ------------- ------- <br /> _ __________________________=___�_ <br /> ---------- - <br /> ___��=====a=====___-_-_---------- <br /> Date Ranqe :O1/09/1989 - 10/25/1996 <br /> CM Work Order Range :1001091070001 - UT2600-02- Patte=n ?*101196750756 <br /> item Ranqe :<Blank> - WP122020001 <br /> Proqram l,LI. Function AI.L activity ALL ____J_ ________________ <br /> -s==—===_________=_ -------------- <br /> _�-___�-=_____-- <br /> CM WORK ORDER ID: 7101196750756 Title: CONVERT 1521 WETMORE AVE <br /> «DUPLICI►TE PRINTZNG OF THIS WOItK ORDER» <br /> Item ID: WS18955116 -- WATER SERVICE <br /> Location ID: '- <br /> Proqram 710 Function 119 Activity 675 <br /> Date Completed: 09/26/1996 <br /> Overall Craft: <br /> Issued: 06/19/1996 Issued by: JSM ?,ssigned to: WDT <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> --------------- ---------- ---------- -------- <br /> ----- ------ ------- -------- - <br /> UL CSG CAVANAH, SHANE G. 0.00 2.00 26.14 <br /> UI, DMJ DOUCETTE, MP.RR J 0.00 2.00 _____30_62 <br /> Total Labor Cost: 56.76 <br /> ![aterials: Date N Used Cost <br /> Ip Description __________ <br /> ------------ ------------------------------ <br /> -------- -------- <br /> BOX000056247 BOX METER PLA 15" X 10" W/LID 09/26/1996 1 12.90 <br /> COUP34135447 COUPLING 3/4" MIP X 1/2"CTSPJ@ 09/26/1996 1 4.04 <br /> ELL034104247 ELL 3/4" 90 DEG STREET BRASS ^ 09/26/1996 1 1.76 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 09/26/1996 1 30.67 <br /> NIPP34131947 NIPPLE 3/4" X 4" BRASS ^ 09/26/1996 1 1.73 <br /> SETT34033647 SETTER COP 5/8" X 3/4" (H12") 09/26/1996 1 52.73 <br /> Total Material Cost: 103.83 <br /> Vehicles: Cost <br /> ip Description Hours <br /> ------------ -------------- <br /> ---------------- ------ ---- <br /> V2117 91 CHEV 1-TON HYD UNIT 2.00 _____11_20 <br /> Total Vehicle Cost: 11. 20 <br /> Work Descriptioa: <br /> --------------------------------------------------------- <br /> METER i141908669 <br /> Total cost for work order 7101196750756: 171.79 <br />