My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4756
>
Resolutions
>
Resolution 4756
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 10:07:24 AM
Creation date
3/9/2017 10:07:13 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4756
Date
5/5/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Port Gardner Bay Outfall Replacement Agreement <br /> 12.2 Operation Generally <br /> Upon completion and final acceptance of the construction, K-C shall operate and <br /> maintain the Joint Use Facilities in compliance with applicable laws, regulations, and this <br /> Agreement. To enable coordination among operating personnel, foster communication <br /> between the Participants and provide oversight, the PRT may draft and approve an <br /> Operations Manual. Changes or modifications to the Operations Manual must be <br /> approved by the PRT prior to becoming effective. K-C shall operate and maintain the <br /> Joint Use Facilities for the benefit of the Participants, and in compliance with any <br /> Operations Manual. <br /> 12.3 Maintenance <br /> The PRT may retain an independent consulting engineer to provide advice on the need <br /> and frequency for Outfall testing and monitoring and to resolve any differences between <br /> the Participants concerning the need, extent or methods for repair or replacement of the <br /> Joint Use Facilities. The cost of the independent engineer shall be included in the Annual <br /> O&M Budget for the year in which the independent engineer's work is performed. <br /> 12.4 Environmental Compliance during Operations <br /> 12.4.1 K-C and the City will each hold separate NPDES permits with specific <br /> requirements pertaining to their respective effluent. K-C and the City will <br /> monitor their respective effluent streams separately prior to their respective <br /> effluent streams being combined and discharged through the Joint Use <br /> Facilities. Each Participant will be responsible for compliance of their <br /> respective effluents with applicable laws, regulations and permits. If the <br /> 25 of 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.