Laserfiche WebLink
Port Gardner Bay Outfall Replacement Agreement <br /> 12.4.4. Characterization costs required by Ecology for assurance that the Outfall is <br /> performing properly will be included in the Annual O&M Budget. <br /> 12.5 Decommissioning <br /> Beginning in year 40, and every five years thereafter(or upon other interval set by the <br /> PRT Representatives), the PRT shall conduct a study of the remaining useful life of the <br /> Joint Use Facilities. In the event that the findings of such study indicates that the Joint <br /> Use Facilities have less than five (5)years of remaining useful life, the PRT shall, at that <br /> time, recommend to the Participants one of the following options: (a) institute measures <br /> to extend the useful life of the existing Joint Use Facilities; (b) plan a replacement project <br /> jointly or otherwise; or(c) undertake a decommissioning program. The costs of these <br /> studies and plans shall be included in the 0 & M Budget. The Participants, acting <br /> through the PRT, may approve expenditures necessary to implement the option selected <br /> by the PRT. <br /> 13 TERMINATION <br /> 13.1 Absent Default <br /> Either party may terminate this Agreement without cause, or default by the other party, <br /> under the following circumstances and in the described manner: <br /> 27 of 46 <br />