Laserfiche WebLink
The ceiling will be re constructed once the chimney is down. <br /> Contractors will replicate and re construct the Pine ceiling with <br /> 2x6 Tung groove pine, 15 lb. felt moisture barrier and insulation to repair and seal the roof/ceiling. <br /> They will match the elevation level surface and not change the roof lines. Once the whole from the <br /> chimney is there they will match. <br /> A roofer,yet to be determined, will be replacing the cedar shingle roof with a new composition roof. <br /> They will repair all under layers of the cedar shingles and put water proof layer to ensure no leaks. <br /> [12,C2 (111 8 r; <br /> LI JUL 6 20;6 LL ) <br /> CITY F' VERET'T <br /> Pe.rrniOt Service; <br /> Permit If: B1606-023 <br /> Site Address: 5005 23RD AVE W <br /> Owner: COLLINGE JARED E JR&JERA A <br /> Tenant: [TenNamel <br /> App.Date: 6/9/2016 <br /> Proposed Use: SFR ALTERATION <br /> Description: REM E CHIMNEY, REPLACE FLOOR& <br /> CEILING FROM DE +I l,, <br /> _ Date:" -30` 16 <br /> Revie ed B <br /> SW <br /> Office Set Job Site Set Fire/Planning Set <br />