Laserfiche WebLink
��� <br /> To: Larry Crawford cc : Ron Cameron, Larry Callahan / <br /> From: Dave Davis <br /> Da[e: 5-1-86 <br /> Subject : House move, 19th/Rucker signal work charges <br /> The estimate cost to remove the flashing signal at <br /> 19th/Rucker is shown below. <br /> � The following work items were included in the estimate: <br /> � 1 . Ai.sconnect sway cable <br /> 2. Disconnect span wire at SE corner pole and lay signal <br /> on NW corner during move <br /> 3. Rewire signal heads and install overtiead sign. <br /> i <br /> 4. Reinstall span wire and sway cable. •'. <br /> f Lebor : <br /> j Bob Fralick 4hrs @ $30. 87/hr x 1 .8177 (ovrhd) _ ^�224.45 <br /> � Plartin Danner 4hrs @ $28.397 x 1 . 8177 = $206.47 <br /> Lanny Vanderberg 4hrs @ $16. 74 x 1 .8177 = $121 . 71 <br /> i ,I <br /> $552 .63 <br /> Vehicle : <br /> Lift truck ; 4hrs (� 525.00/hr = $100.00 <br /> Pfaterials : <br /> � <br /> Wire, clamps, etc . _ $ 50.00 <br /> Total $702 .63 <br /> � <br />