My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 WETMORE AVE 2016-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
2024
>
2024 WETMORE AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 11:05:10 AM
Creation date
3/9/2017 11:05:03 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2024
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' � '. <br /> PUBLIC WORKS PE:RMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> CB.� Connect rooftop dcwnspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout intiltration system per City of Everett <br /> Storm Manuai 3-2.62. Width _, Depth _, Length _ <br /> 10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 11. Remove and replace curb, gutter and sidewzik as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways anci any broken or damaged area must be replaced). <br /> 12. Install a Type I concrete drivewa�- per Ciry of Everett Standar�' #307. <br /> 4Ci ey- <br /> \1�3 Pave driveway from the front property line ou;to the stcael paving. <br /> 14. Contact the Water District tor connecting provisions for this building's <br /> water and sewer services. <br /> 15. Ii a sewer pump system is to be instslled, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-�f-way. <br /> 16. The contractor must meet with the Public Waks Inspector to discuss potentiai drainage <br /> routing prior to beginning the project. <br /> 17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> 18. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wastina of material is allowed on this building lot. <br /> awcaramens �1/,� <br /> vT <br />
The URL can be used to link to this page
Your browser does not support the video tag.