My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5703
>
Resolutions
>
Resolution 5703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 11:22:48 AM
Creation date
3/9/2017 11:22:19 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5703
Date
11/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Esplanade District—this will be the public walkway bordering the shoreline <br /> edge along the entire length of the existing Marina and the new 12th Street Marina in the <br /> location shown on Attachment B. This district will consist of a pedestrian walkway, with <br /> seating areas, viewing places and landscaping that provides a continuous means for public <br /> access and circulation. In places the landscaping will include multiple expanded "mini- <br /> parks"throughout the District. <br /> Generally ground floor shops and restaurants and second floor professional <br /> offices will border the esplanade. This district will include short-term parking and <br /> loading areas available to boat owners and guests, and for shoreline viewing, subject to <br /> the findings and requirements of the traffic and parking management studies. <br /> c. West End District—the area along the westernmost edge of the site will contain <br /> a mix of pedestrian-orientated uses, which may include restaurants, cafes and a hotel. In <br /> addition, a major public plaza will open to the Snohomish River Channel. A pier would <br /> be added as a visiting "tall ships" style mooring dock. <br /> d. Captain's Walk District—the area located roughly in the center of the site will <br /> function as a major pedestrian connection between the existing Marina and the new 12`h <br /> Street Marina. This area will be designed to emphasize pedestrian activity and will use <br /> special paving materials, building designs and displays to emphasize the historical <br /> character of the waterfront and Everett's heritage. If vehicular access is provided, <br /> measures shall be included to reduce traffic speeds. The district will include ground floor <br /> retail and service shops and upper-level offices (including professional offices) along <br /> with potential live-work spaces. The south end of this district is anticipated to include an <br /> area reserved for a public market. <br /> e. Wharf's Edge District—this area is located in the western portion of the <br /> Property landward of the 200-foot shoreline management zone. This will be the <br /> residential neighborhood with a variety of housing types. Parking will be integrated into <br /> the design of the buildings so as to minimize surface parking and maximize open space. <br /> Retail and service uses may be located on the first floor of buildings fronting the marina <br /> to the south and the Captain's walk to the east. The housing would be organized around a <br /> major east-west pedestrian way or"promenade" (13`h Street) containing small stopping <br /> places and extensive landscaping. This promenade would be open to the public. This <br /> district will also contain another north-south pedestrian connection. This north-south <br /> pedestrian connection will connect the new, proposed, marina esplanade with the <br /> esplanade along the existing marina. <br /> f. Gateway District—the eastern portion of the property adjacent to West Marine <br /> View Drive except the portion in the Craftsmen District. This district will serve as a <br /> main gateway into the site for autos, cyclists and pedestrians. It will provide the <br /> transition area that will accommodate larger buildings for corporate/high technology <br /> users and larger retailers. It could also be used to as the location for a parking structure <br /> to provide long term site parking for boaters and for special events, depending on the <br /> outcome of the traffic study and parking management plan. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.