My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5703
>
Resolutions
>
Resolution 5703
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 11:22:48 AM
Creation date
3/9/2017 11:22:19 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
5703
Date
11/16/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> PDO DESIGN GUIDELINES <br /> frontage <br /> 1. FRONTAGE IMPROVEMENTS AND BUILDINGS <br /> ALONG WEST MARINE VIEW DRIVE <br /> INTENT: <br /> To create a pleasant and inviting edge for the North Marina Development, while <br /> providing a safe pedestrian atmosphere, and establishing a well defined gateway <br /> into the site. To provide a sense of order, rhythm and enclosure along the street <br /> and to provide a buffer between pedestrians and vehicles. <br /> GUIDELINES: <br /> 1.a. The main entrance at 13th Street will be designed in such a way as <br /> to distinguish it as both the main access to the site and to set the standard for <br /> the development that lies beyond. <br /> 1.b. A landscaped strip with street trees will be installed per City <br /> landscape standard Type III, Section 35.050 of the Everett Municipal Code (EMC) <br /> between the curb and the sidewalk. The trees shall have a minimum trunk <br /> diameter of 2 1/2 " at the time of planting. The landscape strip shall be a <br /> minimum of 5' in width. <br /> 1.c Spacing of street trees in the landscape strip shall be no more than <br /> 30' apart. Spacing may be modified to avoid obscuring pedestrian crossings, <br /> street signage, traffic signals and street lights. <br /> 1.d. A sidewalk at least 12'wide, along the west side of West Marine <br /> View Drive, will be installed behind the landscape strip. The City Engineer will <br /> work with the project designers to place a bike path. <br /> 1.e. Variation of the facades of the buildings will be used to break up <br /> the mass and scale of the buildings. <br /> 1.f. Three access points to the site will be provided, one north of 13th <br /> Street which provides direct access to the Craftsman District, the main entrance <br /> at 13th and a secondary entrance at 14th Street, or at an location acceptable to <br /> the City of Everett. <br /> 1.g. Street light design, signage and landscaping shall be compatible <br /> and consistent with the entire North Marina Development. ,> <br /> 6 <br /> North Marina Design Standards & Guidelines <br />
The URL can be used to link to this page
Your browser does not support the video tag.