My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2229 WETMORE AVE 2018-01-02 MF Import
>
Address Records
>
WETMORE AVE
>
2229
>
2229 WETMORE AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2023 3:26:53 PM
Creation date
3/9/2017 11:29:19 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2229
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Supports for solar modules are Installed to spread the dead load across 3s many roof - <br />framing members as needed to ensure that no point load exceeds fifty (50) pounds, <br />❑ <br />(IRC M2302.2.1(5)) <br />12. The photovoltalc modules and supporting structure shall be constructed of <br />noncombustible materials or fire -retardant treated wood equivalent to that required for <br />❑ <br />the roof construction. (IRC M2302.2.1) <br />_ <br />13, Roof and wall penetrations shall be flashed and sealed to prevent entry of water, <br />❑ <br />rodents, and Insects. (IRCM2302.2.2) <br />14. PV modules are listed and labeled with a Pre classification In accordance with UL 1703. <br />❑ <br />(IRCM2302.23) ' <br />Comments: <br />i ... If you answered yes to all of the above questlons, the project qualifies for the over-the- <br />counter permitting process. <br />Determine if your project qualifies for an Over -the -Counter electrical permit <br />Yes <br />No <br />N/A <br />El <br />i. <br />PV modules, Inverters, and combiner bones are Identified for use In PV systems. <br />El <br />2. <br />The Inverters are listed and labeled In accordance with UL 1741 and are listed for <br />utility Interaction. (IRC 102302.41 <br />3. <br />The AC Interconnection point Is on the load side of service disconnect. (NEC 690.64(B)) <br />P3 <br />❑ <br />.❑ <br />4. <br />The system meets all current NEC, City and Washington Cities Electrical Code <br />requirements. <br />_ <br />S. <br />For Split -Buss modules the AC interconnection must be one of the six service <br />disconnects. <br />6. <br />Maximum load added to the paneiboard is based on the rating of the panelboards bus/maln <br />OCPD <br />combination In accordance with NEC 705.12(0)(2)(3)(b), and Is limited to (check combination that <br />applies): <br />0225 amp bus/200 amp maln OCPD - 13,440 AC watts, maximum 70 amp Inverter OCPD. <br />13225 amp bus/225 amp main OCPD - 8,640 AC watts, maximum 45 amp Inverter OCPD. <br />❑200 amp bus/200 amp main OCPD - 7,860 AC watts, maximum 40 amp Inverter OCPD. <br />t0P150 amp bus/150 amp main OCPD - 5,760 AC watts, maximum 30 amp Inverter OCPD. <br />❑ 125 amp bus/1Z5 amp m,ln OCPD - 4,800 AC watts, maximum 25 amp Inverter OCPD. <br />012Sampbus/100ampmalnOCPD- 9,600 AC watts, maximum 50 amp Inverter OCPD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.