My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2306 WETMORE AVE 2016-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
2306
>
2306 WETMORE AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 11:32:57 AM
Creation date
3/9/2017 11:32:39 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2306
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� c <br /> � PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> � Connecl side sewer per City Standard#'s 601, 602, 604. II <br /> �) Connect all rooRop downspouts to the side sewer. �I <br /> 7. Connect rooftop downspouts to the drainege syslem provided for this lot. <br /> 8. Rooflop runoff musl be discharged to a roof downspout infiltration system per City of Everett Slorm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25'long. See attachment for <br /> more details. <br /> L. 9. / The conlractor musl meet with lhe Public Works Inspector to discuss polential drainage routing prior to <br /> �� beginning ihe projecl. <br /> 1�� Install erosion conlrol measures as determined by the P�blic Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blanhsts. <br /> 11. Install erosion control measures per Cily of Everett Standards for small parcels <br /> � Remove erosion conlrol measures upon complelion of the project prior to final approval of lhe permit. <br /> �3? AII excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted sile. No wasling of material is aliowed on this building lot. <br /> 144 No dirt, mud, rocks or debris to be tracked onlo roadway. <br /> 15�/ No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> /� <br /> 16.'� Adjust waler meter box 1"above sidewalk grade. <br /> �7. ' Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan#'s 305A 8 306 on <br /> �� this proposal's frontage as directed by lhe Public Works Inspeclor(i.e.all unused driveways and ar.y <br /> broken or damac�ed area musl be replaced). <br /> 18. Inslall a Type I concrete driveway per Cily of Everelt Standard i/307. <br /> ( 19^� Pave driveway from lhehent property line out lo lhe sMed!paving. <br /> �� <br /> 20. Contact the Water Dislrict for connecting provisions for lhis building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan tt402 with a gas trap per Standard Plan #410 is required for ihe <br /> parking area. <br /> 22. If a sewcr pump syslem is to be installed, the pressure line must discharge into a private manhole,then <br /> gravily ilow across the public ric�ht-of-way. <br /> 23. A sprinkler system is required(or tliis building in compliance with the requirenients of NFDA Standards <br /> 13 D. <br /> fs � FOR PUBLIC WORKS INSPECTION,CALL RANDY AT 425-339-7403 <br /> T S/��>'GZ`,:v>., 0�2 hecJ �I�d iS /e�Uivr.G� �•-� <br /> �Ns /�i�u,fcc7�. [Jud¢rc/� -�o o% Wor� <<-� �v� Lu�erS <br /> t-X Q h � �{� <br /> PI'iCen�nts � � ✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.