My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4681
>
Resolutions
>
Resolution 4681
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 11:47:35 AM
Creation date
3/9/2017 11:47:34 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4681
Date
11/4/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> Resolution Number 4681 t4cigal <br /> A Resolution accepting the 10 percent petition <br /> and authorizing submittal of the 75 percent petition <br /> for the Murphy's Corner Annexation <br /> WHEREAS, The City of Everett has received a 10 percent petition for <br /> annexation meeting the requirements of RCW 35.13.125. <br /> WHEREAS, the City of Everett has a desire to work with citizens around Everett <br /> in unincorporated Snohomish County to become part of the City of Everett, and <br /> WHEREAS, the area proposed for annexation is within the Urban Growth <br /> Boundary established by Snohomish County. <br /> NOW, THEREFORE BE IT RESOLVED: <br /> 1. The City of Everett wishes to accept the 10 percent petition for the <br /> proposed annexation and authorize the signature collection for the 75% <br /> petition. <br /> 2. The City of Everett will require the simultaneous implementation of the <br /> Comprehensive Plan designation by adoption of the zoning for the <br /> annexation area. <br /> 3. The City of Everett will require the assumption of this annexation's portion <br /> of existing City indebtedness. <br /> Councilperson Introducing Resolution <br /> l <br /> Passed and approved this 4th day of November a 997 <br /> Council President <br /> anmu04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.