Laserfiche WebLink
i , , . <br /> 3. Pedestrian access shall be maintained on the frontaqes of the site <br /> per UBC Chapter 44 and the Manual on Uniform Traffic Control <br /> Devices (MUTCD) , except for short periods approved by the City <br /> Public Works Department. The pedestrian access on the east side <br /> of Colby shall be a minimum of 6 feet wide. The pedestrian access <br /> north of California, south of Everett Avenue, and west of Wetmore <br /> Avenue can be 4 feet in width. A pedestrian access plan must be <br /> approved by the City Public Works Department prior to the issuance <br /> of any permits. <br /> 4. �, construction site access/haulinq plan must be approved by the <br /> City�s Public Works Department for each phase prior to issuance of <br /> any permits (except for permits for on-site soils remediation) . <br /> The plan must show how conflicts between pedestrians and truck <br /> traffic can be minimized. a fence may be permitted to separate <br /> the truck area from the travelled way on Colby l�venue. <br /> 5. Traffic control during periods of street closures will be provided <br /> as required by the City of Everett Public Works Department. <br /> 6. Construction truck traffic must be limited to arterials, unless <br /> otherwise approved by the City's Public Works Department. <br /> J. TRIINSPORT7►TION: !lOTOR V�iICLS TRI►FFIC (SEPA Land and Shoreline <br /> Use, Transportation, and Enerqy and Natural Resources Policies, <br /> Interim Traffic Mitigation Ordinance No. 1670-89, as amended) <br /> 1. �pg�tion Detand Man[ qe�ent <br /> A Transportation Demand Manaqement (TDM) Program is required for <br /> the ofPice/retail buildings. The purpose of the program is to <br /> meet the gonls of SSHB 1671, 1991 Legislature: 15$ reduction in <br /> proportion of Sinqle Occupancy Vehicles (SOVs) by 1995, 25� <br /> reduction in proportion of SOV�s by 1997, and 35$ reduction in <br /> proportion of SOVs by 1999. The Proqram must consist of the <br /> followinq elements: <br /> a. Employee Transportntion Coordinator (ETC) - The Buildinq Owner <br /> must designate an ETC who will be the main point of contact for <br /> the buildinq�s tenants, the City of Everett, Everett Transit <br /> and Community Transit. <br /> The ETC's duties must include: <br /> 1. Administer the proqram. <br /> 2. 1►ssist employeea with program registration. <br /> 3. Develop and maintain the ridematch database and distribute <br /> the match list. <br /> 4. Promote and answer questions on the rideshare proqrem. <br /> 5. Distribute rideshare and transit information. <br /> 6. Aasist the formation of carpools through personal contacts. <br /> 9 <br />