My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2710 WETMORE AVE 2018-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
2710
>
2710 WETMORE AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 12:19:38 PM
Creation date
3/9/2017 12:38:40 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2710
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
667
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 10, 1993 <br /> �nr�c�FOR OUALiFICATIONS <br /> To authorize advertisement of a Request tor Qualiticatioas for the Everett <br /> Transit Comprehensive Plan Update. <br /> LABOR AGREEMENT - AFSCME <br /> To authorize the Mayor to sign lhe 1993-1995 labor asreement between the <br /> City and AF'SCME. <br /> . � <br /> ���1,0 . ��9�• <br /> HANGE ORDER - TRANSIT OPERATION CENTER <br /> To authorize Change Order No. 1 for the Transit Operation Center in the <br /> amount of S14,000. <br /> W.p . �� �fb <br /> � �OB COMPLETE PEDESTRIAN PATHWAYS & CURB RAMPS <br /> To accept the Pedestrian Pathways & Curb Ramps project as complete and <br /> begin the 30 day retention period for the release of retainage in the amount <br /> of 56,422.80 to the contractor, Associated Sand & Gravel Co., Inc. <br /> c�-'� � �l l.t.�2�Y16'1,�, I"'�L'�'-' <br /> �,HANCfi ORDER - COMMUNITY THEATER <br /> To authorize the Mayor to sign Change Order No. 4 in the amount oC <br /> S10,600 for the purpose of adding a new signai pole base and resilient iloor <br /> for the Community 'Cheater project. <br /> The Public Works Department has scheduled the interse�tion of Everett Avenue <br /> and Wetmore for signal reconstruction and up-grade. The signal pole base is <br /> ]ocated within the theater construction contract azea and would require duplicate <br /> and wasted effort and cost if Ihe 10 foot dexp signal base, required for the <br /> project, were delayed until after the theater contract is complete. The theater <br /> contractor has agreed to perform the required work at a cost of 59,995. This <br /> cost is complztely reimbursable by Public Works funds and will not be added <br /> cost to the Communily Theater pro�ect. The theater contractor has also agreed <br /> to upgrade the stagc: floor to semi-rigid at a cost of $9,882. A private <br /> contnbution has been received to cover the entire cost of the floor modification. <br /> *The increased cost of this change order is reimbursed by funding sources <br /> ouuide of the Theater Construction Budget, and no additional consWction <br /> budget funds are required in order to approve the change order. <br /> 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.