My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2710 WETMORE AVE 2018-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
2710
>
2710 WETMORE AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 12:19:38 PM
Creation date
3/9/2017 12:38:40 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2710
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
667
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ <br /> ,.,.� �"'�' ► Memorandum <br /> �' ' " <br /> NBBJAichileUuie Desipn Plonninq <br /> lll SomA laiksan 9me� Sennle,Wothinpion 98101 17061 2t3�5555 f o�17061 6)1�7300 <br /> March 4, 1992 <br /> T�: File <br /> From: Sue Alden ��/ <br /> Re: Everett Community'Cheater <br /> project No. 24284.10 <br /> Subject: Minutes of ineecing with Everett Building Department <br /> Febcuary 24, 1992 <br /> Tim Tyler City of Evecett Building Division <br /> Present: City of Everett Building Division <br /> leff McFail NB&� <br /> Nick Charles NB� <br /> Sue Alden <br /> A set of the DD submitta� plens Were left for review and comroents by the Building Division. 1Le set had <br /> been colored co indicate partition ratings; occupancy loads and exit widths were noted. 'lt�e p�ans were <br /> quickly reviewed to indicate the plan developments since the last meeting. <br /> Aisle railings weree a,B[,ahie state retain�ee UBCrequ rement�wli le leattle deleted it.�Tha DA doas not <br /> center of the stag . t�s the relate to "stairs"• 1t was saBB��ed��NBBI <br /> address railings at stepped or ramped a�s�es� ea��eP y <br /> write a letter to the Cit with pertinent information and let them make the decision on whether or not to <br /> inclu e em. <br /> _ _ .� Ngg1 proposed providing a smoke vestibule at the pit level only, since there aze stairs and other openings <br /> between the upper floors as ailowed by code. Ieff and Tim will think about this and call us lata with a <br /> decision. <br /> NggJ reyuesced a decision on whether we y ay use the sprinkler ezcepn�e�but aliows th e ceP�°"�We <br /> �eeded for area if we have a 54 foot south Fire departme�ntUa�cesspW�reviewed and it was aBre��at <br /> p�G �mp►y with Sec. 508 items (a)thr°uhave been rovided. It was decided we could use the Sec. 508 sprinkler <br /> adequate openings per Sec. 3802 (b) P <br /> substitution for 1-hour protection. <br /> Sue requested a list of approved concrete mixes so theY wuld be incorporated in to our specifications. <br /> Everett does not have such a list for building concretes. 'Cha Public Works DepacuneM may have it for <br /> street work. City Standards may also be available through them for curbs, ramps, �c. <br /> Curtains at the back of House vestibules aze acceptable, in lieu of a second pair of doors, fo� a s�undnight <br /> lock, as long as they stack out of the way. It was assumed they would only be pulled for plays and musical <br /> performances, When acoustics are more critical. <br /> Design Review Approval must be obtained from the Planning Director for building elevations, p�ans> sit� <br /> plan, streetscape p�an and signage. Civil work should i:e reviewed with Public Works. NBBI wi11 meet with <br /> them to assure we are in compliance. <br /> 9/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.