My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2730 WETMORE AVE 2011 BUILDING SHELL 2016-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
2730
>
2011 BUILDING SHELL
>
2730 WETMORE AVE 2011 BUILDING SHELL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 12:50:33 PM
Creation date
3/9/2017 12:50:13 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2730
Tenant Name
2011 BUILDING SHELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENi' <br /> UtiliHes Division,3200 Cedar Strcet <br /> � ' Everett WA 98201 <br /> 425-257-8800 <br /> �,C /Oo�'- aa3 <br /> ReceiPt # � /QOS " Qo�3 Date Paid a A� 9�-��-o� <br /> Costof Work Order Work OrderN <br /> X Cost of Service Order Service Order H Ja g�f 3 <br /> ContactPerson Ruben SanChe2 TelephoneH <br /> Requested By Ruben Sanchez Date of Request <br /> Property owner(name) C.O.E., Facilities and Maintenance <br /> Charge Cost to (name if dffferent than owner) <br /> Address 2930 Wetmore Ave City �verett _ Zip 98201 <br /> InstallaHon LocaHon 1621 California Avenue_ <br /> Inst,llation type/description/size/etc. Complete 4" fire service installation from main to DCDA and <br /> stub out of vault. C.O.E. to do all restoration. <br /> � The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please noHfy the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for sc:ieduling and�arts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> otivner thereof, and provided further, that any excess payment shall be retumed to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or sche3uling work. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material 6,974.00 cc: Bldg.PermitCenter <br /> Mark Sadler <br /> Labor and Benefits 8,359.00 Kirk Brooks <br /> E ui ment Rental 6,870.00 Gordan Witcher <br /> 9 � Matt Welborn <br /> Tax 388.00 Mike Ward <br /> f�ifftlndar�- <br /> TOTAL 22,591.00 Randy Allen <br /> Pmpared by: Mike Ward � �� Date Estimate Prepazed 5/18H0 <br /> Acceptedby: �J�I,1 S/{�1GNEZ /y Representing 'pygG. L�Gpr• <br /> ESTIMATE COOD FOR 6 M110NTHS <br /> 5:\N Common\dedcal\Costest\Z010\3621 Cali(ornia Ave 051810.doc �1 <br /> 3/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.