My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 WETMORE AVE WELLS FARGO BANK 2018-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
2801
>
WELLS FARGO BANK
>
2801 WETMORE AVE WELLS FARGO BANK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 3:06:12 PM
Creation date
3/9/2017 1:06:33 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2801
Tenant Name
WELLS FARGO BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAXES �sn�o ��NmK,, �� �,�,�;.�, <br /> SuY M1 <br /> E�MI,VW Yl20t <br /> pl�425.7�'.9fM0 <br /> lu�73.7�6.17�7 <br /> MTENo.: s�on �� <br /> �ao�s s.noa�.wrr <br /> Projact: WELLS FARGO PRK. GRG.VAULT s,a,e,� <br /> Address: 2801 Wetmore �+�� <br /> SeatUe. WA �,����0 <br /> PERMIT�: BLD01-00222 <br /> IIar�Yne al�e. <br /> 7911!E S71A DNya <br /> Owner: �+� <br /> Architect: Portli'°'°R°n" <br /> q,smx,.rs,s <br /> Enginee,- w sxiaa+.�sn <br /> Contractor. Gestson ConstrucUon <br /> Page 1 <br /> Date: 11/2/01 <br /> Weather. <br /> Inspection: Pachometer investlgation <br /> Reported to jobsite as requested by Rick (Geston) to conduct pachometer investigation of <br /> underside of vault slab, at five locations. Potential re-steel centerlines were mapped and <br /> marked in immediate areas of above locatlons. Buffer areas of 1"each side of idenGfied re-stesl <br /> centerlines were identified, as to prescribe field areas (hatched area-red)where confidence <br /> levels are high, as not to hit any primary steel during drilling and installatlon of expansion <br /> anchors. Rick confirtned above mapping was acceptable for his purposes. <br /> Preliminary Inspection. <br /> INSPECTOR: Mark Galusha <br /> Data: 11/8/01 <br /> Weather: <br /> Inspection: Structural Steel <br /> Onsite at Wells Fargo for visual inspection of welding, bolting, and epoxy dowels. Arrived onsite <br /> at 0700 as requested. Contractor did not show up to provide approved plans for project. Left a <br /> voice mail at 0715 for Rick (Geston Construction) about inspection. No inspections perfortned <br /> this visit. <br /> INSPECTOR: Mark Vassailo <br /> Reviewed by: <br /> r{c A. Galusha, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.