My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2802 WETMORE AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
WETMORE AVE
>
2802
>
BASE FILE
>
2802 WETMORE AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2022 4:01:51 PM
Creation date
3/9/2017 1:08:25 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2802
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />l5 � " 0 " F LIC WORKS DEPARTMENT <br />COST DIVISION <br />ESTIMATE SHEET APR 18 7994 D 2300ITIES CEDAR STREET <br />TREET <br />EVERETT, WASHINGTON 98201 <br />CITY OF EVERETT (206) 259-8800 <br />Receipt # Public Works Dept. <br />Date Paid <br />Cost of Work Order $__ Work Order # <br />X Cost of Service Order $ 5,873.00 Service Order # (, <br />zQ <br />Contact Person: Rick Reininoer Telephone # 388-8400 <br />Requested By: Paul Date of Request 4-14-94 <br />Property Owner (name) JDH Group <br />Charge Cost to (name if different than owner) Same <br />�5st� 7i <br />Address 72'S-�3 Wetmore City Everett Zip 98201 <br />Installation Location Port Gardner Bldg, 2802 Wetmore Everett 98201 <br />Installation type/description/size/etc. Excavate for 6" tap install <br />10'+-0+-611 ductile pipe and restore sidewalk <br />[X1 The following .estimate is rased upon the Utilities Division <br />providing all labor, equipment, materials, restoration, and final <br />hook-up. <br />( 1 The following estimate is based upon the Street Division work group <br />providing all labor, equipment, materials and restoration to <br />property. <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, <br />material, equipment rental and administrative costs, the deficit shall be charged to <br />the property for which such installation was made and the owner thereof, and provided <br />further, that any excess payment shall be returned to the person applying for the <br />installation. <br />Itemized Cost Estimate: <br />Labor & Overhead 3.934.00 cc: Bldg. Permit counter <br />Clair Olivers <br />Material 709.00 Tom Thetford <br />Don Weitkamp <br />Equipment Rental 11090.00 Kirk Brooks <br />Surface Restoration 140.00 Gordon WitcherDan Lowell <br />Total 5,873.00 Stan Mitchell <br />Prepared by Garza % <br />Accepte ���^ f�- Representing=�/�F?��� <br />Revised 08/16/91 <br />cost:yjl39cst (4/15/94) <br />
The URL can be used to link to this page
Your browser does not support the video tag.