Laserfiche WebLink
NBBJ <br />kthileme Design nanning <br />June 7, 1994 <br />Mr. Jeffrey McFall <br />Everett Public Works <br />3200 Cedar Street <br />Everett, WA. 98201 <br />Subject: Port Gardner Building <br />Daar Jeff: <br />W <br />f, <br />i�_ JUN - 8 1994 <br />CITY OF veRE...j'" <br />Put31iC "I li(s Dept. <br />This letter is in record of our telephone conversation yesterday, confirming the issues we <br />discussed . <br />The one-story, theater building kill the south side of the Site includes it laminated wood <br />truss root' with some exposed structural steel elements. NB13J asked if an acceptable <br />solution to fire -proofing would he to use GW13 to enclose the required areas? <br />A: The City of Everett, will require ceiling void ae he sprinkled. <br />2. The storage room behind the elevators in the basement is accessed by a corridor between <br />stair NI and the elevator. The corridor also has a run of steps in it. The building <br />owners would like to close off that space by installing it door. Since the corridor is <br />narrow (3'4"), the door would not comply with Washington state harrier free Standards. <br />Can this door he installed since the spa, e it serves is unoccupied? <br />A: The City of Everett requires all doors to comply with the harrier free standards. <br />3. The existing aaudiailrguardrail for slait H1 does out comply with current building code <br />requirements. Will this condition he required to get upgraded to meet code? <br />A: The condition will not have its he upgraded if no work is (lone to it (leave it as it <br />exists). <br />Please call me if you have any questions or corrections. <br />Sincere y. <br />Jett Dalc <br />cc: Mr. Rick Reininger <br />• <br />Mr. Dorm Anderson <br />Alia o no (a l i lot n is New Yolk Na tth(a t of i no Ohio Wa s h In g 100 <br />111 South ladson Sneet Senile, Wishington 98104 000223d555 tax (206)621-2300 <br />