Laserfiche WebLink
INSPECTION REPORT <br />v <br />Address �DQ�W &Yn Lr_ <br />S Contractor_ <br />l� Owner _� O(1�S1—u� <br />bay-ey Date -- ` 9 1— <br />APPROVA J PARTIAL APPROVAL <br />J N ❑ CORRECTION REQUESTED <br />O Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />Ct Was not able to perform inspection. <br />J CALL 259-8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />J Temp. Elect. <br />J Footing <br />J Foundation <br />J Ductwork <br />J Wood Stove <br />J Masonry <br />U BLDG: Pmt, No. <br />J ELEC: Pmt. <br />TYPE OF INSPECTION REQUESTED <br />-1-1 <br />❑ Framing <br />J Gas Piping <br />❑ Drywall, Nailing <br />J Consultation <br />❑ Shear Nailing <br />J Groundwork <br />Grid <br />J Struct. Slab <br />Rough -in <br />J Final <br />i.]Service <br />J Insulation <br />❑ Other- <br />MECH: Pmt. No. )( <br />*LBG: Pmt. No. �'5y / <br />