Laserfiche WebLink
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425)257-8810 <br />Date: 8/27/2009 - <br />Public Works Permit #: PWO908-051 <br />Buildinq Permit #; <br />Planninq Reference #: <br />Public Works Fee $ $ 0.00 <br />Other $: <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />PORT GARDNER PARTNERS LLC <br />TRINITY LUTHERAN COLLEGE <br />2610 WETMORE AVE <br />2802 WETMORE AVE <br />EVERETT WA 98201 <br />EVERETT WA 98201 <br />PHONE: <br />PHONE: 4252494800 ___ _ <br />TAX PARCEL ID # 00439166702100 <br />SITE ADDRESS: /`1802 WETMORE AVE <br />DESCRIPTION OF PROPOSED WORK: <br />--- / <br />BBO'S (PERSONAL- SIZE) ON SIDEWALK IN FRONT OF BUILDING <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2 All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications <br />3 Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 i- <br />4 Allow room for pedestrians to pass by on the sidewalk <br />r <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />U <br />AUG 27� <br />CITY OI' EV►,:,s. ; <br />Permit Servic. <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />,.�----27-0`I <br />7 <br />CSi§nature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT 15 ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED 10 COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />