Laserfiche WebLink
s <br />LEE JOHNSON & �15SOCIATES <br />1712 PACIf-IC AY[hU[ <br />February 12, 1969 <br />City of Everett <br />6uilding Departnunt <br />City fiall <br />Everett, Washington <br />co�sui_ri�c r_��iree�s <br />LVERETT, WASHI�IGTON 'J87.01 <br />98201 <br />RE: NEW CEILIWG IN 4UIL6IIJG AT 2819 lJET140RE AVEI�UL, EVERFTT <br />J06 NO.S68-045 -- <br />Gentlemen: <br />,����m� �-co7i <br />Fidelity Savings and Loan Corporation hired us to check and advise <br />regarding the above mentioned subject. <br />The second floor is not presently in use and to the best of our <br />knowledge will not be used in the future. The framing of this floo�� <br />consists of 3"x14" floor joists, 28'-3" long, spanning East-',Jest. <br />The new ceiling will be suspended from the second floor framing by <br />nailing 2"x4" hangers at 2'-0" on center to alternate floor jo;sts at <br />their midspan. <br />One 2"x8" ribbon will be nailed to each side of the bottom ends of the <br />hange�•�. Joist hangers are nailed to the ribbon from wliicli the 2"x6" <br />ceiling joists will be supported at 16" spacings. <br />N 5/8" sheetrock ceiling then will �e nailed to the bottom of the <br />ceiling joists to complete the job. <br />We found this construction structurally adequate. <br />Very truly yours, <br />LEE�JOHNSOfJ�& l`$SOCIATES, IIJC. <br />�� � I <br />; <br />�I � ; ��� <br />C.IDJ�d e, P.E. <br />f I\' I 1. Ii ^I f- 1 �� 1 I C 1�. f- • <br />till.l'CTl'R.\I. I�.I`.(-1TLI.CI�tiG • I.A"I- tiU4PC\'IYF <br />� <br />