My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 WETMORE AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
WETMORE AVE
>
2930
>
BASE FILE
>
2930 WETMORE AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 1:19:53 PM
Creation date
3/9/2017 1:26:51 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2930
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASCADE TESTING L JORATORV, INC. <br />TCSTING G INSPECTION - ENGINEERS <br />14120 N E. 'I,,STREET <br />UELLEVUE, WASHINGTON 92001 <br />PHONE 206 1641 2573 <br />Seattle 1 525 6700 <br />S her�ale L.rvan <br />12061 602 5020 1706) 259 010 T <br />_ <br />Whiteley/Jacobsen _ <br />2118 Third Avenue <br />Seattle, IVA 98121 <br />Jack IVhitclev <br />I'I FOLLC%%ING WAS NOTED <br />DATL <br />3/4/80 <br />797 121: _ <br />PRUJLCI <br />Wall Street Building <br />L OCA I ON <br />Wetmore $ Wall - Everett IVA <br />RI OG PERMIT NO <br />OWNER <br />Wall St. Group <br />WEATHER <br />TEMP AT Q AM <br />cloudy <br />52 <T_,- <br />LNGINLER <br />IV/J/A <br />ARCIIU LcT — <br />W/J/A <br />CUNIRACTOR <br />Baugh Construction <br />Resteel: <br />Inspected low wall at ground floor perimeter of building. Line <br />D-H(1) and Row G(G-H) Forms were clean tiglit and well braced. Re - <br />steel in place and checked okay for size grade spacing and form <br />clearance. <br />Concrete: <br />Inspected placement of 7 cubic vards of 5 1/2 sk/c buff concrete <br />in above described locations. Concrete was placed by wheeling and <br />mechanically vibrated. <br />One set of three (3) cylinders was cast. Please refer to <br />concrete report dated 3/4/80 for details_ <br />TOURS ON PROJECT <br />'RAVEL TIME <br />(RAVEL MILEAGL <br />PFROVFD OY <br />Es Tn WjA-Col:_BC--WSG-ASCIG <br />r.i911'II11, Fred <br />FIELD REP( <br />.. -._... .,NLU ,-�. <br />I <br />7 11AR C 194n <br />1, i)1 OF 1'.� _ <br />? pectioll Dept. <br />
The URL can be used to link to this page
Your browser does not support the video tag.