Laserfiche WebLink
Deter 16 <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />rvrnnn�y rrcuivao <br />ugly <br />P.WIC Works Per I • <br />BIRO JaPI, s f•^ ' <br />NWIC works Fee S rorel Fee <br />Leas l opt Fee Paid S <br />Balance Due <br />f•none <br />Applicant Mailing Address City Zip Phone <br />Project Address (d known) <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the, following as applicable. <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed qrading changes <br />• Existing and proposed utilities • Show measurement <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800-424.5555. <br />t�b aL IL woz'�-:. f�Krt I i <br />)'l CDT ir�vC-' <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />3200tt,WA Street <br />Everett, WA 98201 <br />Phone: 259.8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />H <br />Cal <br />O <br />The undersigned owner/applicant hereby agrees to hold and gave harm- <br />less the City of Everett from any and all claims for damages, costs. <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-nf-v By use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public,, property damaged thereby. <br />Signature or Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTEO WI-i HIN <br />160 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CI fY UPON ANY STOPPAGE OF WORK ON HIS <br />PROJECT OVER 90 DAYS DURATION. <br />