Laserfiche WebLink
INSPECTION MADE OF THE CITY HALL <br />By Hills Collins and John Fattens <br />March 16, 1971 <br />Page 2 <br />b. Activate exit light in stairway, at door to main corridor: <br />e. Add a 1-hour partition and 1-3/4 inch solid core door with self closer, <br />with fusible link in hall from clerk's office to stair. <br />d. Add fusible link type self closer on door from police department to . <br />stair. <br />e. Add directional exit light on ceiling of landing at doors from clerk's <br />office and police department. <br />E. Change council chamber door swing. Doors to swing out of council chamber. <br />g. Change swing of sin„lc door in council chamber to swing out. <br />h. Add exit lights over double doors and single door from council chamber. <br />I. Add direct directional exit light over door which is opposite the single <br />door from council chamber, to point down corridor to the clerk's office. <br />J. Add exit light over door from private corridor to clerk's office. <br />k. Add exit light over main entrance doors. <br />1. Add fusible link in closer of private hall door ouside of council chamber <br />-- to maia hall. <br />Basement <br />a. Change door to stair with 1,3/4 inch solid core with self closer with <br />fusible link. <br />b. Activate exit light over door to stair. <br />c. Activate existing north side ¢xit door with panic hardware. <br />d. Add exit light over north side exit door <br />e. Add exit light over door to room with exit door. <br />f. Add directional telling light in room adjoining room with exit door. <br />g. Add exit light over door to room adjoining the room with exit door. <br />h. Install self closer in door to garage. <br />If it is the intention to retain the third floor as an office, then the bars should <br />be removed from the windows of the third floor. <br />