My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3131 WETMORE AVE 2016-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
3131
>
3131 WETMORE AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2017 7:22:42 PM
Creation date
3/9/2017 1:39:51 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
3131
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 1, 2003 <br />vecic wotirs <br />Bryan Blair <br />rirst Baptist Chureh <br />1616 Pacific Avenue <br />Everett, WA 98201 <br />/ PUBLIC SERVICES DEPARTMENT <br />Project: Youth Building Change of Use <br />Job Address: 3131 Wetmorc Ave <br />Plan Review No: C0304-fl18 <br />Dear Mr. Blair: <br />In response to your application for a construction permit, your plans have been examined <br />and you are advised that the issuance of a permit is being withheld for Ihe reasons listed <br />below�, 'I'he�e comments address building issues only. Additional revisions or additions <br />may be required by other departments (such as Utilities, Planning or Fire). All references <br />refer to the 1997 Uniform Building code, as amended by the State of Washington and/or <br />the Washington State Energy Code, 1997 edition, unless noted otherwise. <br />This review does not cover submitted mechanical, sprinkler, electrical or plumbing <br />documents — these permits must be obtained separately and may require further review <br />and suLmission of plans. <br />In order for the processing of your application to continue, it will be nece,ssary to <br />provide the Building Division with two complete new sets of drawings reflectlng the <br />corrections requested. <br />Upon further consultation, we are reversing our previous decision to require an <br />accessible entrance (parking space, ramp and doorway) as long as the total cost of <br />all alterations to this facility within any 12-month period amounts to 60 percent or <br />more of the appraised value. Therefore, if you do not desire to build the parking <br />spacc and elevated walkway, then please remove Ihem from the construction <br />drawings. <br />2. Guardrails are required on each side of the rebuilt front stairway. They can have <br />no openings in which a 4" diameter sphere may pass through. The height of the <br />guardrail must be between 34" and 38" above the tread nosings. Section 509.2 <br />CITY OF EVERETT• 3200 Cedar SVeet • Everett, WA 98201 •(425) 257-8200 • Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.