Laserfiche WebLink
:WIN <br />r% <br />INFORMATION FOR DEVELOPER: <br />1. Detailed drawings in accordance with City Design and Construction <br />Standards shall be submitted to the Public Works Department showing <br />site parking layout, landscaping, utilities, storm drainage, temporary <br />construction erosion control, and all required improvements in the <br />public right-of-way. Public Works Department approval of these <br />drawings is required prior to any permits being issued. All <br />improvements shall be completed, approved, and warranted before the <br />Occupancy Permit is issued. <br />2. City streets and alleys are to be kept clear of dirt and debris at all <br />times during construction. Dust suppression and street cleaning must <br />occur as directed oy the Public Works Inspector. <br />3. Performance guarantees are required for the curb, gutter and sidewalk. <br />4. Monitored intrusion i.e. alarm system zoned for each proposed use must <br />be provided, and 2 fire exits from the 3rd floor must be provided. <br />5. A one-year guarantee is required on the public street, utility and site <br />landscaping for an amount not less than 10% of the cost of construction <br />and shall run for one year from the date of issuance of the first <br />Occupancy Permit for the project. <br />6. The Police Department has the following security recommendations: <br />a. The perimeter doors should be solid core with 190 degree to 220 <br />degree wide angle viewers and single cylinder deadbolts with 1" <br />throw and at least 3" screws securing striker plate. <br />b. Bay windows should overlook the parking lot for increased <br />security of vehicles. <br />C. Sliding glass doors should have charlie bars installed for <br />optimum security. <br />d. Lighting of the parking lot should be a minimum of 1-2 foot <br />candles. <br />e. During the final stages of construction, please contact Dick <br />Thornberry, Crime Prpvention Officer at 259-0416 for further <br />security recommendati .s. <br />7. GTE Northwest has facilities at this location. Any building entrances <br />must be coordinated at least 60 days in advance. Your contact at GTE <br />Northwest is Frank Taylor at 339-2035 for this building entrance. <br />8. Any required landscaping provided in the City right-of-vay must be <br />approved by the Public Works Department and must be leased from the <br />city. <br />5491F <br />-4- <br />