Laserfiche WebLink
INSPECTION REPORT '< <br />AddressLrr <br />Contractor - <br />Owner <br />Date <br />J APPROVAL J PARTIAL APPROVAL <br />J VIOLATION &CORRECTION REQUESTED <br />O Corrections listed below MUST RE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />O Was not able to perform inspection. <br />eO CALOR REINSPECTION —24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />nN THE PREMISES PRIOR TO OCCUPANCY. <br />Z V Date <br />TYPE OF INSPECTION REO'jESTED <br />J Temp. Elect. <br />J Framing <br />J Gas Piping <br />J Footin <br />J Drywal , Nailing <br />J Shear Nailing <br />J Consultation <br />J Groundwork <br />Jf ounoation <br />-AATDuclwork <br />id <br />J Strucl. Slab <br />J Wood Stove <br />R ugh -in <br />Service <br />J Final <br />J Insulation <br />J Masonry <br />J <br />J Otherr <br />— <br />Y <br />J BLDG: Pmt. No. <br />_—. p tAECH, Pmt. No <br />_>` <br />J ELEC: Pmt. No.— <br />J PLBG: Pmt. No.— <br />