Laserfiche WebLink
INSPECTION REPORT <br />Address <br />Contractor - <br />Owner --- <br />Date <br />J APPROVAL JPARTIAL APPROVAL <br />J VIOLATION BIM CORRECTION REQUESTED <br />Corrections listed below MUST BE MADE before work can be approved. <br />7 Please contact inspector and arrange for appointment. <br />J Was not able to perform inspection. <br />)CALL 259-8810 FOR REINSPECTION - 24 hour notice required <br />A CERT t OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />7 <br />TYPE OF INSPECTION REQUESTED <br />J Temp. Elect. <br />J Framing <br />J Drywall, Nailing <br />J Gas Piping <br />J Consultallon <br />J Footuig <br />J Foundation <br />J Shear Nailing <br />J Groundwork <br />J Struct. Slab <br />J Ductwork <br />❑ Grid <br />❑ Rough -in <br />anal <br />J Wood Stove <br />❑ Service <br />J Insulation <br />J Masonry <br />U Other <br />J BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />J ELEC: Pmt. No. �PLBG: Pmt. No. <br />— J <br />