Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System Page 2 <br />07/15/1996 <br />Date Range :01/09/1989 - 07/03/1996 <br />CM Work Order Range :1001091070001 - UT1002- - PPaatteern :7101096750199 <br />Item Range :<Blank> - WW22020001 <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101096750199 (continued) <br />TEE046304047 <br />TEE <br />�� n <br />F„ X 6 ALL GASKETED <br />06 28 1996 <br />06/28/1 996 <br />1 15.08 <br />1 11.10 <br />WYE044303947 <br />WYE <br />6 ALL GASKETED <br />Total Material Cost: 102.78 <br />Vehicles: <br />Description <br />Hours <br />Cost <br />ID <br />___-___--- <br />-10.00 <br />------------ <br />V2006 <br />-------------- <br />87 <br />---------------- <br />TOYOTA PU <br />1400 <br />. 0 <br />78.40 <br />V2111 <br />92 <br />CHEV 1-TON <br />.00 <br />5.00 <br />28.00 <br />V2113 <br />91 <br />CHEV 1-TON <br />5.00 <br />235.50 <br />V2663 <br />87 <br />VACTOR <br />22.00 <br />930.60 <br />V3603 <br />86 <br />CASE BACKHOE 780 <br />22.00 <br />497.20 <br />VJ0002 <br />93 <br />INTERNATIONAL 10 YD <br />---------- <br />Total <br />Vehicle Cost: <br />1820.70 <br />Work Description: <br />NEW STATIONING 2101. REPLACED 6' OF MAIN 11' DEEP. <br />6° PIPE TO CURB LINE. REDUCED TO 4^ UNDER SIDEWALK <br />2' BEHIND SIDEWALK 4' DEEP BEHIND SIDEWALK. <br />Total cost for work order 7101096750199: <br />TOP OF STANDPIPE IS 7' DEEP <br />REPLACED PIPE FROM MAIN <br />---3877 84 <br />