Laserfiche WebLink
-3sIS bEf-p-,,ar - <br />Structural Design Associates <br />North Star Building <br />2120 Howitt Ave, Suite 4J1 <br />Everett, WA. 98201 <br />(425)339-0293 <br />July 24, 2001 <br />Locken Designer Homes <br />Attn.: Don <br />2116 131" Ave. NE <br />Lake Stevens, WA 98258 <br />Subject: Wetmore Quadplex Footing Change <br />SDA Ref # AHP 21061 <br />To whom this may concern: <br />At the request of Don Locken, this office reviewed the holdown footings along the from of the building <br />for a larger continuous footing to replace the spread footings. Also discussed was the use of 7/16" <br />Oriented Strand Board sheathing to replace the 15/32 shearwall and roof sheathing. <br />A new continuous footing, 2'-0" wide x 2'-6" thick, reinforced with (3) # 5, may be used along the front <br />of the building, to replace the spread footings located under the shearwall holdowns. <br />7/16" APA rated Oriented Strand Board may be used to replace the 15/32" CDX sheathing, as shown on <br />the approved set of drawings, installed over''/] inch or 5/8 inch gypsum sheathing, structurally acceptable <br />per UBC table 23Jq-1-1. <br />Please contact <br />tn- <br />tCovi <br />office if you have any questions concerning these plan changes. <br />r <br />P.E. <br />rOEIVE <br />JUL3 0 2001 <br />CITpY rOF S rvERETT <br />I EXPIRES I - 5 -V Z ' <br />