Laserfiche WebLink
I <br />I <br />CITY OF EVERETT <br />DEPARTMENT OF PUBLIC WORKS 12 <br />0 1 <br />UTILITIES DIVISION <br />UTILITY WORK ORDER <br />Date: MZWATER <br />❑ SEWER <br />❑ STORM <br />I" <br />W.O. Instruct <br />Q' SERVICE <br />❑ <br />MAIN <br />❑ <br />PUMP STATION <br />❑ <br />TREATMENT <br />❑ <br />RESERVOIR <br />❑ <br />VALVE <br />❑ <br />MAN HOLE <br />❑ <br />CATCH BASIN <br />❑ <br />DITCH <br />W.O. No. //p <br />Acct. No. <br />Complaint No. <br />Er MAINTENANCE <br />❑ OPERATION <br />❑ REPAIR <br />❑ CONSTRUCTION <br />Qo 1 nvlr i cu <br />ACTUAL <br />Labor (hours) <br />Labor (hours) _ <br />Material (cost) <br />Material (cost) <br />Equipment (cost) <br />Equipment (cost) <br />SCHEDULING REQUESTED <br />USE CHARGE ACCOUNT NUMBER BELOW FOR LABOR TIME SLIPS, ITEMIZE <br />LABOR, EQUIPMENT, AND MATERIALS ON REVERSE SIDE. <br />Completion (Date): /L 3 S O Cost:$ <br />Charge Account Number: _ Charge Cost To (Name): <br />Address: <br />