Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management Sys:s-m <br />10/10/1996 Page 2 <br />Date Range :01/09/1989 - 09/30/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101096750233 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101096750233 (continued) <br />PIPE44304247 <br />PIPE <br />6" <br />PVC SEWER <br />09/12/1996 <br />16 <br />PIPE46304347 <br />PIPE <br />8" <br />PVC SEWER <br />09/12/1996 <br />3 <br />PLUG44307747 <br />PLUG <br />6" <br />(PVC) SEWER BELL END <br />09/12/1996 <br />1 <br />REDU44303847 <br />REDUCER <br />6" SP X 4" GASKETED <br />09/12/1996 <br />1 <br />TEE046304047 <br />TEE <br />8" <br />X 6" ALL GASKETED <br />09/12/1996 <br />1 <br />WYE044303947 <br />WYE <br />6" <br />ALL GASKETED <br />09/12/1996 <br />1 <br />Total Material Cost: <br />Vehicles: <br />ID <br />Description <br />Hours <br />------ <br />Cost <br />---------- <br />------------ <br />V0010 <br />------------------------------ <br />'92 GMC S10 PU <br />5.00 <br />28.50 <br />V2086 <br />91 DODGE PU 1/2 TON <br />1.50 <br />8.40 <br />V2112 <br />91 CHEV 1 TON <br />6.00 <br />33.36 <br />V2147 <br />87 CHEV 1.5 YD <br />2.00 <br />19.68 <br />V2152 <br />87 DODGE W/HOIST <br />19.00 <br />96.90 <br />V2225 <br />88 FORD 8YD <br />5.00 <br />78.05 <br />V2227 <br />88 FORD 8YD <br />1.00 <br />15.61 <br />V2663 <br />87 VACTOR <br />3.00 <br />141.30 <br />V3200 <br />80 CASE VIBRO14AX W25 ROLLER <br />5.00 <br />128.85 <br />V3603 <br />86 CASE BACKHOE 780 <br />20.00 <br />846.00 <br />V6401 <br />80 CASE FLATBED TRAILER <br />5.00 <br />0.00 <br />V6807 <br />89 COMPRESSOR IR <br />19.00 <br />93.10 <br />VJ0002 <br />93 INTERNATIONAL 10 YD <br />20.00 <br />452.00 <br />VJ0005 <br />'95 FORD 1.5 YARD <br />2.00 <br />22.44 <br />VJ0007 <br />95 1 TON FORD <br />1.00 <br />6_10 <br />21.60 <br />6.87 <br />2.09 <br />4.84 <br />15.08 <br />10.63 <br />----276.19 <br />_ IS"T.a9 <br />$S;4C <br />Total Vehicle Cost: 1970.29 <br />Work Description: <br />------------------------------------ <br />REPLACED SIDE SEWER MAIN TO PROPERTY LINE. CUSTOMERS SIDE VERY ROTTED OJT -LET <br />CUSTOMER KNOW CONDITION, MAIN AT 13' DEEP, STAND PIPE 6' DEEP. CHANGE STATION <br />ING TO 3951- FROM 398 <br />DRAWING ATTACHED. <br />Total cost for work order 7101096750233: 4318.80 <br />