Laserfiche WebLink
everett INSPECTION REPORT <br />eAddress �)��� �J� ���,—_ <br />Contractor ���� � � <br />Owner <br />Date — _ � �PS�S <br />TYPE OF INSPECTION REQUESTED <br />O BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />ys�EC: Pmt. No. �❑ PLBG: Pmt. No. <br />� <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />C Foundation ❑ Shear Nailina ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />❑ Wood Stove ❑ Rough•In �Bfnal <br />❑ Masonry �.gService ❑ <br />❑ APPROVAL ❑ P9 RTIAL A?PROVAL <br />❑ VIOLATIJN �CORRECTION REQUIRED <br />orrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not sbfo i� perform Inspection. <br />❑ CALL 259•8910 FOR REINSPEGTION — 24 hour notice required. <br />A CERTIFICATF OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspeclor _/I"�� � Date �_ <br />� <br />