Laserfiche WebLink
everett <br />e <br />INSPEGTION REPORT <br />Address �1z� �LtMO(�Q <br />Contractor � �Cl/�i1Q/� `�'- i7� P� <br />Owner � �� I� *^ - <br />Date <br />TYPE OF INSPECTION REQUESTED <br />i BLDG: PmL No. <br />❑ MECH: Pmt. No. <br />JS.ELEC: PmL No. �c4� � i� PLBG: PmL No. <br />❑ Temp. Elect. ❑ Framiny ❑ Gas Piping <br />❑ Footing ❑ Drywail, Nailing O Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Guctwork ❑ Grid D Struct. Slab <br />G �Nood Stove ❑ Rough•In �Final <br />C Masonry ❑ Service <br />�APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections lis�ed below MUST BE MADE bP�ore work can be approved. <br />❑ Please contact inspector and arrange (or appointment. <br />❑ Was not able to peAorm inspection. <br />❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />TNE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />