My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/02/15 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/02/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 2:15:34 PM
Creation date
3/9/2017 2:15:08 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E 49113 FT A 8 <br /> SCOPE OF WORK <br /> 2017-2018 On-Call Surveying Services <br /> 1.The Contractor agrees to furnish the service of a licensed professional land surveyor(PLS)and appropriate <br /> technical/survey field personnel to provide on-call survey services for the City as defined by the Task Assignment' <br /> • <br /> Scope of Services and recorded on the Formal Task Assignment Document(attached). • <br /> • 2.The survey crew shall work on an"as Required"basis only,as determined by the City's Project Manager or <br /> Construction Engineer.If the Contractor is not in a position to provide the survey crew at the time requested by the <br /> City,the Contractor may decline the request without prejudice. <br /> 3.Prior to mutual acceptance of a task assignment,the Contractor will prepare a written itemined cost estimate for <br /> the requested services. <br /> 4.The survey crew shall be supervised by a licensed PLS and shall coordinate with the Project Manager or <br /> Construction Engineer,as required,to ensure all required surveying in the task assignment is performed as requested <br /> by the City. <br /> 5.The survey party chief shall be responsible to keep all notes in a city-furnished book and shall record a day-to-day <br /> report of all survey activities.Said survey book shall be returned to the City Project Manager or Construction <br /> Engineer a the completion of the work.Survey field notes shall conform to the requirements of the most recent <br /> • edition of the"Survey and CAD Standards for the City of Everett." <br /> 6.All survey drawings,cross sections and profiles shall be prepared in AutoCAD in accordance with the most recent <br /> • <br /> edition of the"Survey and CAD Standards for the City of Everett." • <br /> • 7.The Surveyor shall schedule and meet with the City CAD Manager prior to beginning any survey work to establish <br /> control,required standards,electronic exchange standards and to pickup a field book.This meeting is required for <br /> each task assignment. <br /> Documents to be furnished by the Contractor • <br /> 1:C m-pleted-(City-finnished)-fieizkbook. <br /> 2.Survey deliverables will typically include: ' <br /> a.Original drawings on 22"x 34"reproducible media • <br /> b.Electronic drawing files in Civil 3D or AutoCAD"dwg"format <br /> c.Point files including point#,northing,easting,elevation and description <br /> d.Land files <br /> e.Any digital terrain model file(eg:DTM,DEM,etc.)generated from the assigned work <br /> • <br /> • <br /> Page 12 <br /> (Foam Approved by City Attorney's Office January 7,201453pdated November 21,2016) • <br />
The URL can be used to link to this page
Your browser does not support the video tag.