My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/02/15 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/02/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 2:15:34 PM
Creation date
3/9/2017 2:15:08 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 9 <br /> PROJECT TITLE: <br /> Award the contract for the Briefing COUNCIL BILL# <br /> construction of Water Proposed Action Originating Department Public Works/Utilities <br /> Filtration Plant(WFP) Consent Contact Person Richard Hefti <br /> Operations Building Seismic X Action Phone Number 425-257-7215 <br /> Retrofit Project to Kassel & First Reading FOR AGENDA OF February 15,2017 <br /> Associates, Inc. Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President Al <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filtration Plant Call for Bids, September Bid Summary Public Works <br /> 28,2016 <br /> Amount Budgeted. $1,000,000 Fund No. 336 <br /> Expenditure Required $756,942 Account Number(s): UP 3600 <br /> Budget Remaining $36,658 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Bids were opened on January 31,2017, and three bids were received. <br /> Kassel&Associates, Inc. submitted the lowest bid in the amount of$756,942. <br /> The Engineer's Opinion of Probable Construction Cost is$900,000. <br /> Previously, Council authorized hiring a design consultant(AECOM)for$185,400 and authorized $19,000 <br /> for Amendment No. 1. Advertising for bids cost$2,000. The budget remaining for construction will be <br /> $36,658. <br /> With this award,the Mayor is authorized to enter into a contract with Kassell&Associates, Inc. in the <br /> amount of$756,942.00, including Washington State sales tax. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Award the contract for the construction of the Water Filtration Plant(WFP) Operations Building Seismic <br /> Retrofit Project to Kassel&Associates, Inc., in the amount of$756,942.00, including Washington State <br /> sales tax. <br /> 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.