Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Call for Bids for the Briefing COUNCIL BILL# <br /> construction of Water Main Proposed Action Originating Department Public Works/Utilities <br /> Replacement"Q"—Evergreen X Consent Contact Person Richard Hefti <br /> Way Project Action Phone Number 425-257-7215 <br /> First Reading FOR AGENDA OF February 15, 2017 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President A <br /> V <br /> Location Preceding Action Attachments Department(s)Approval <br /> Evergreen Way between Location Map Public Works <br /> Holly Drive and East <br /> Casino Road <br /> Amount Budgeted $660,000 Fund 336 <br /> Expenditure Required $2,000 Account Number(s): UP 3612 <br /> Budget Remaining $658,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Water Main Replacement"Q"—Evergreen Way (UP3612)will reline about 2,500 feet of existing 12-inch <br /> diameter cast iron pipe along the east side of Evergreen Way between Holly Drive and East Casino Road. <br /> The 12-inch cast iron pipe in this location was installed in 1933 and is experiencing significant internal <br /> mineral deposit buildup causing it to lose more than half of its flow capacity. The relining project will <br /> require constructing a temporary water bypass to provide water to area businesses. It will also require <br /> cleaning out the mineral deposits from the existing pipe prior to relining with a synthetic water-safe lining. <br /> The project is ready to advertise for construction bids at the cost of$2000. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Call for Bids for the construction of the Water Main Replacement"Q"—Evergreen Way <br /> Project. <br /> 3 <br />