My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3909 WETMORE AVE 2016-01-01 MF Import
>
Address Records
>
WETMORE AVE
>
3909
>
3909 WETMORE AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 3:27:39 PM
Creation date
3/9/2017 2:20:27 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
3909
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 25, 1979 <br />Donald L. Berkey, P.E. <br />Chief Distribution Englneer <br />Snohomish County P.U.D. <br />p, p, Box 1107 <br />Everett, WA 98206 <br />ATTN: Corrine White <br />Subject: P.U.D. Permit il �I"1 •z� <br />w.o. n 87$ <br />` ti �1..., l�'/�./(�.{/ �-Y�l <br />� <br />the Evergreen <br />crcr oF <br />evPrett <br />utv weu • :e�+>se <br />f.Vf11CTl. WA{NINGTON <br />1�i01 <br />Dear pon: <br />Your application for a permit to install a portion of underground power system <br />within the public right-of-way has been ap�roved on October 24, 1979 as per <br />plan (W.O. 986441)• <br />The subject permit approval is based on thc agreement ;hat ail work will bc <br />carried out in accordance with the City of t3verett standards and American <br />Public Works Association specifications for trench excavation and backiilling <br />(Reference: Section 61, par. 3.05 and 3.06). All hard surface street crossings <br />shall be by jacking, boring or ather preapproved construction methods. <br />It will be the obligation of the utility company to bear any cost:, that may be <br />incurred intes*ing and confirming the requirement. <br />The restoration of all landscaping and repairs will be comparable with its original <br />eondition and to the satisfaction of the Cit;� Engineer or his appointed representative. <br />It will be your responsibility to contact the City Engineering Department (phone <br />259-8811)immediately prior to starting construction. <br />Sincerely, <br />HUGH WARREN, P.E. <br />Director of Public Works <br />�e�/�n�--- <br />By: Jeff Kerwin <br />Utility Inspectcr <br />HW:JK:jd <br />
The URL can be used to link to this page
Your browser does not support the video tag.