Laserfiche WebLink
Work AcNvity Work Order <br />Work Order Numbe� 20032035 <br />EQUIPMENZ----- -- -- ------- - <br />ID DESCRIPTION Dals Unib <br />MATERIAL: <br />ID <br />BRIC00081158 <br />CAP014307147 <br />COUP44300147 <br />CAUP18900047 <br />ELL041303447 <br />ELL01130384T <br />PIPE413042N <br />PIPE18301347 <br />PLUGM307747 <br />TEE01830�W7 <br />WYE0143039l7 <br />MISCELLANEOUS: <br />ID <br />DF_SCRIPTION <br />BRICK, 2-114 X 4 X 8 GREY CONC <br />CAP 8 GASKETED PVC SEYVER <br />COUPLIN� B CONCRETE X 8 CIIP <br />COUPLING B CONCRETE X B CIIPIA <br />ELBOW 8 BELL X SPIGOT 45 DEG P <br />ELBOW 6 BELL X SPIGOT 22-112 D <br />PIPE 6 PVC SEWER ASTMD-3034 80 <br />PIPE 8 PVC SEWER ASTMD-3034 80 <br />PLUG 6(f'VC) SEWER BELL END <br />TEE 8 BELL X B BELL X 6 BELL P <br />WYE 8 BELL X 8 BELL X 6 BELL P <br />DESCRIPTION <br />Sub Total <br />Date <br />10107C1003 <br />1010712003 <br />101072003 <br />tOf07/2003 <br />10N7@003 <br />10I07Il003 <br />10107/2003 <br />1M1712003 <br />10l07/2003 <br />10I07f2003 <br />�orornoa� <br />Units <br />5.00 <br />1.00 <br />1.00 <br />2.0(� <br />2.00 <br />2.00 <br />39.00 <br />3.00 <br />1.00 <br />1.00 <br />2.00 <br />Sub Total <br />Date Units <br />SUI) T01;�I <br />!Ke Z <br />12/23/2003 10:5: <br />Cost <br />Coet <br />{1.28 <br />t3.11 <br />t5.25 <br />St5.69 <br />59.33 <br />f9.36 <br />{53.70 <br />i8.92 <br />51.87 <br />512.22 <br />i20.e3 <br />i1�.11 <br />Coat <br />f0.00 <br />RECORDS <br />�JAN 0 6 2001 <br />