Laserfiche WebLink
� J <br />CLOSED Qk NORR ORDERS REPORT <br />City of Everett Total Utility Maintenance Management System <br />03/22/1994 Paqe 1 <br />�ss��ssserssitazssssas�s�ssss�ss� :ms��nss�� <br />Date Ranqe :03/O1/1992 - 03/17/1994 <br />CM Work Order Range :<Blank> - 8405421030229 Pattern :7401196750791 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Proqram ]►LL Function ]�LL 1►ctivity ALL <br />=����e=���:��������:�=�::�Q������������:���«��: <br />CM WORIC ORDER ID: 7401196750791 Title: REPAIR 431 WETMORE /9✓� <br />«pUPLIC.ATE PRIHTING OF THIS WORIC ORDER» <br />Item ID: WS0795S032 -- WATER SERVICE <br />Location ID: -- <br />Proqram 740 Function 119 Activity 675 <br />Data Completed: 03/09/1994 <br />Overall Craft: <br />Issued: 03/08/1994 <br />out of Service? NO <br />Meter Reading: <br />Downtime: o hours <br />Status: <br />Labor: <br />Craft ID <br />----- ------ <br />UL I1311 <br />WST WDT <br />Materials: <br />ID <br />Name <br />issued by: SKL ]�ssianed to: <br />Priority: Travel Time: 0.00 Hr. <br />LIHBING, M1IURICE A. <br />FIALDEN, DAROLD T. <br />Dsscription <br />1►DAP34000547 AD]►PTER 3/4" MIP X INST11-TITE@ <br />B�X000056247 BOX METER PLA 15" X 10" W/LID <br />COUP34004647 COUPLING 3/4^ 1►NG MET X FZP 2 <br />COUP34142747 CQUPLING 3/4" CTS COMP X MIPTE <br />ELL034101449 ELL 3/4" 90 DEG BRASS " <br />PIPE34060647 PIPE 3/4" pOLY I.P.S. <br />VaLV34008348 VALVE METER 3/4" LOCK W2NG IP@ <br />vehicles: <br />ID Description <br />------------ ----------------- <br />V214G SVC TRUCK CHEV Q7 <br />Planned Hrs 1►ctual Hrs <br />----------- ---------- <br />0.00 3.00 <br />0.00 3.00 <br />Total Labor Cost: <br />Date <br />03/09/1994 <br />03/09/1994 <br />03/09/1994 <br />03/09/1994 <br />03/09/1994 <br />03/09/1994 <br />03/09/1994 <br />Cost <br />41.04 <br />54.96 <br />96 00 <br />$ Used Cost <br />4 <br />1 <br />1 <br />2 <br />2 <br />2 <br />1 <br />Total Material Cost: <br />Date Hours <br />-------- ------ <br />03/09/1994 3.00 <br />32.24 <br />12.34 <br />4.21 <br />10.54 <br />3.10 <br />0.50 <br />8.49 <br />----71.42 <br />Cost <br />15.60 <br />Total Vehicle Cost: 15.E0 <br />Total cost for work order 7401196750791: 183 02 <br />