Laserfiche WebLink
� <br />, Total Utility�MaintenanceRMa�nBagement�Sy�e�OSTING °� 1 a � <br />07/22/1998 Page 1 <br />ceev='e'aaeavzsasac=ce¢ssssecascasssaceazsvicessve�isssavsssszees:mecssscccveasvc <br />Date Range :06/24/1900 - 06/30/1998 <br />CM Work Order Range :0810800810001 - UT28�0-30-322Pattern :7101196649743 <br />Item Range :<Blank> - WVL3694L05 Pattern :• <br />Program ALL Function ALL Activity ALL <br />==sam�mav===cxassscaesssv==s�s=sas=sas=aa--sscsssasasscvs=ssc¢a=aevzc�es:ss <br />CM WORK ORDER ID: 7101196649743 Title: SO .75 INCA 5321 YIETMORE AVE <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 664 <br />Date Completed: 06/23/1998 <br />Overall Craft: <br />Isaued: OS/29/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 houre <br />Status: <br />Labore <br />Craft ID <br />UL CSG <br />WST TDE1 <br />Matozials: <br />ZD <br />ADAP34000547 <br />BOX000065547 <br />CORP34001847 <br />COUP34003947 <br />COUP34004047 <br />ELL034104247 <br />METE36089447 <br />N/A <br />PIPE34060647 <br />SADD44016847 <br />SETT34033647 <br />Vahiclea: <br />ID <br />VH0003 <br />VJ0026 <br />Ieaued by: Aesigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />--------------- <br />CAVANAH, SHANE G. <br />THOMPSON, DWAYNE E. <br />Actual Hra <br />5.00 <br />5.00 <br />Planned Hra Coet <br />----------- ---------- <br />0.00 72.55 <br />0.00 103.85 <br />Total Labor Coet: 176.40 <br />Deacription <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER CONC W/STEEL LID <br />CORP STOP 3/4" CCT X INSTA @ <br />COUPLING 3/4" 1/4 BEND COPPER� <br />COUPLING 3/4" 1/8 BEND COPPER� <br />ELL 3/4" 90 DEG STREET BRASS " <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />TRACING WIRE . <br />PIPE 3/4" POLY I.P.S. <br />SERVICE SADDLE 6" W/3/4" CCT <br />SETTER COP 5/8" X 3/4" (H12") <br />Description <br />--------••--------------------- <br />94 CAT BACKHOE <br />'97 FORD 1 TON SVC TRUCK <br />Date # Uaed Cost <br />-------- -------- ---------- <br />07/O1/1998 1 E'.41 <br />07/07./1998 1 47.Q1 <br />07/O1/1998 1 15.45 <br />07/U1/1998 1 7.55 <br />07/O1/1998 1 6.57 <br />07/O1/1998 1 1.62 <br />07/O1/1 8 1 30.67 <br />07/O1/ 998 4 4. <br />07/O1 1998 35 6.30 <br />07/O1/1998 1 12.04 <br />07/O1/1998 1 52.81 <br />Total Material Cost: 193.73 <br />— �� <br />Hours Coat �BQ .33 <br />------ ---------- <br />5.00 124.50 <br />5.00 29.50 <br />Total Vehicle Cost: 154.GD <br />Work Description: <br />---------------------------------------------------------------- <br />