Laserfiche WebLink
� <br />NWEC LOir�iilSE RESI�ENTIAL COIII�LIANCE CHECK <br />A��ted dw�lllnp�, s 9 �torl��, Zon� 1, W�it�rn Waihlnpton <br />IN�PECTION �MPORTANT: Pl��s� �u 1 InforM�tlon ra u��t�d In th� ihad�d box b�tow. <br />APPROYED pp y 4 <br />Dlanp�rd toplcs th�t don't d��crlb� your bulidlnp or �qulpm�nt. DO NOT <br />pl�c� ch�ckt In th� two I�tt eolumn�. <br />I I I FOUNDATION PHASE: �•% , <br />❑ ❑ S016� 0�I9�t9t1011(Chapter 8, Option 111, or Chap 4 oniy): Olazirp on the Atde oH the <br />Iwme must lace wfthin 45 depreea o1 due soulh. No rtare than 60% of the plazinp may Ile between 31 to <br />Choo�� an A or B optlon and below pr�d� wall Iniulatlon optlon: <br />0 Radon Mltlp�tlon slab requiremeMs will ba addreeaed by: • <br />❑ A. 4" course prade prave base under elab Qurisdk:tbn wlll offer free Radon monRorinq optbn) <br />OR <br />❑ B. Siab won't be poured over p�avel base, Dwellinfl will be monkored for Radon when <br />� completed. (Department staB wlll provfde detailed requtremeMs of this optbn) <br />Slab Intulatlon wlll be ❑ R10 (ChlfB, all optbns) or f� R�Chii4 or5): <br />' ❑ A. Exterior slab Insulation wlll extend downward to froslline or the siab bottom. <br />OR <br />❑ B. Interior slab insulatbn will exlend dowmuard from the top slab suAace to Its unde►suAace <br />� � and horizontally under the slab tor a total distance oi 24", or vertically 24'. <br />BNow prad� ma�onry w�ll In�ul�tlnn will be: <br />❑ R10 (Ch N6, All optbns) on the exterbr wall instead ol R19 interbr insulatbn. See NWEC <br />OR FINAL PHASE REQUIREMENTS) <br />� RL(Chepter 4 or 5) ��> �F � /' �'�"0� <br />❑ Thermal bra�k(s) wlll b� plec�d In th� tl�b between the condftbned and uncondftbned apaces <br />checked bebw, and extend irom the top of the slab to the Eottom, then undemeath toward the <br />conditbned space for a 24" total devebped dimerreton. <br />[I dwellinp/parage ❑ dwellinp/connected space R9 slab edpe and foundation wall. <br />❑ ❑ Expos�d �bove•prad� Insulatlon protected wfth stucco coatinp, or metal or plastfc flashing. <br />❑ Vapor ntard�r(<1 perm) requlred underthe slab because course p�ade gravel eRher Is not installed or <br />less than 2' lhick. <br />�'} p In�ul�tlon Is approved ior sub-yrade, exterloruse and properly installed. <br />NWEC Foundatlon phase requlrements: <br />Approvad by: <br />Dete <br />Pepe 3 of 7 <br />