Laserfiche WebLink
V <br />5. <br />18. <br />19` <br />20. <br />21. <br />22 <br />PUBLIC WORKS PERMIT COMMENTS <br />Connecl side sewer per City Standard #601. <br />Conner.t side sewer per City Slandard #'s G01, G02, 604. <br />Connect all rooftop downspouls to the side sewer. <br />Connecl rooflop downspouls to lhe drainage system provided (or this lol <br />Rooflop runofi musl be discharged to a roo( downspoul in(illralion syslem per City of Everetl Slorm <br />Manual 3-2.6.2. The aporoximate size trench is 3.5' wide, 2' deep and 25' long. See attachmenl tor <br />more delails. <br />The contrector musl meet with the Public 1Norks Inspeclor to discuss polential a�ainage routing prior lo <br />beginning the project. <br />Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or �,osion blankets. <br />Inslall erosion control measures per Cily of EvereU Slandards for small parcels <br />Remove erosion control measures upon complelion o( the project pr�or to final approval of the permit. <br />All excavaled material irom (oundation, sidewalk and driveways shall be hauled lo an approved, <br />permilted site. No was�inc� oi malerial is allowed on lhis building lol. <br />No dirt, mud. rocks or debris lo be tracked onto roadway. <br />No building malerials lo be stacked on sidewalks and sidewalks lo be kept dean and open for <br />pedeslnan travel. <br />Adjust water meter box 1" above sidewalk grade. <br />Remove and replace curb, c�uller and sidewalk as per Cily of Everett Slandard Plan #'s 305A 8 306 on <br />lhis proposal's fronlage as directed by ihe Public Works h�speclor (i.e. all unused driveways and any <br />broken or damaged area musl be replaced). <br />Install a Type I concrele driveway per Cily of Everetl Standard #307. <br />Pave driveway from the'ironl property line oul lo Ihe sireet paving. <br />Contactthe _ <br />sewer services. <br />Water Dislricl tor connecting provisions (or lhis building's water and <br />A catch basin as per Cily Slandard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area. <br />If a sewer pump system is to be installed, lhe pressure line musl discharge into a privale manhole, then <br />gravity flow across the public right•of-way. <br />23. A sprinkler system is required (or this building in compliance with the requirements of NFDA Slandards <br />13D, <br />P�rccmmerds � f � <br />